Ognjen C.
Electrical Design Engineer | Power, Control Panels & Automation | EPLAN, AutoCAD
About
INDUSTRIES I KNOW FROM THE INSIDE
- Tobacco: 12 years on tobacco factories for Philip Morris International, JTI and RNTA in Russia, the USA, Italy, the Netherlands, South Korea, Malaysia, Indonesia, Tunisia and Sudan. Electrical supervisor on machine installation and commissioning, then process engineer and site coordinator (PMI training centre in Bologna, PMI Holland, vice site coordinator in Wilson, NC).
- Pharmaceutical: Spimaco factory in Saudi Arabia. Electrical works for cleanrooms, HVAC power and controls, fire protection systems, machine installation and commissioning.
- Water and waste: wastewater treatment plants, pumping stations and a regional waste management centre, on EBRD/FIDIC-funded projects.
- Buildings and infrastructure: the main railway station in Belgrade, commercial and residential buildings.
WHAT I DESIGN
Power and installations
- MV/LV transformer substations, diesel generators, relay protection
- Main LV switchboards, distribution boards and MCCs, ATS, power factor correction
- Power, lighting and socket layouts, cable routes and tray layouts, external cable networks
- Earthing and lightning protection, temporary site power
Panels and automation
- LV switchboards to IEC 61439, MCC and PLC panels (Siemens S7)
- Motor feeders with VFDs and soft starters, I/O allocation, junction boxes, control philosophy
HVAC and cleanrooms
- Power supply and controls for air handling units, fans, pumps and cleanroom areas
Low-current systems
- CCTV, fire alarm, structured cabling, telecom, commercial audio
Calculations
- Load balance, cable sizing, voltage drop, short circuit, selectivity (SIMARIS design)
- Power factor correction, harmonics, lighting, earthing, lightning protection, UPS and DC systems
Documentation
- Complete design packages from concept to as-built
- Bills of quantities, cost estimates, tender documents and RFQs
- FAT and commissioning documentation
- Independent QC review of third-party drawings before anything gets built
RECENT WORK
- Regional waste management centre: main LV switchboard, MCC, a 56-sheet PLC panel and pump station junction boxes, with the full calculation package and the bill of quantities
- Wastewater treatment plants: substations and generators, power and lighting installations, cable networks, MCC and control panels, as-built documentation
- Pumping station QC: reviewed about 190 pages of panel schematics and found 30+ errors before manufacturing
- Belgrade railway station: lighting, power and cable tray layouts, panel schematics, temporary site power
Tools: EPLAN Electric P8, AutoCAD, AutoCAD Electrical, Civil 3D, SIMARIS design, Excel. Standards: IEC / EN.
HOW I WORK
- One master data list feeds every drawing, terminal plan and cable list, so nothing contradicts
- Every package is checked before delivery: cross-references, terminals, title blocks, BOM
- Your title block and symbol standard, a revision round included
- Fixed price for complete packages, hourly for ongoing support
- Central European time, replies within a few hours
MSc Electrical Power Engineering, BSc Automation. English, Russian, Italian, Serbian.
Send me your load list, drawings or just a sketch, and I'll reply with scope, price and delivery time.
Experience
- Electrical Engineer - Capital Projects Specialist DOT Networks d.o.o. · Full-time May 2026 – Present 6 mos Belgrade, Serbia Capital Projects Division. Electrical design and coordination across EBRD/FIDIC-funded infrastructure projects: wastewater treatment plants, pumping stations, a regional waste management centre and a railway station site. Substations and generators, power and lighting installations, external cable networks, switchboard, MCC and PLC panel documentation in AutoCAD and EPLAN. Calculation packages, bills of quantities, RFQs, FAT coordination, as-built documentation and review of third-party schematics.
- Electrical Engineer - Substation Relay Protection Elektrovolt d.o.o. · Full-time Dec 2025 – May 2026 5 mos Valjevo, Serbia Relay protection for MV/LV transformer substations: protection schemes on single line diagrams, CT/VT measuring circuits, breaker control and interlocking, relay settings and coordination with LV protection.
- Company Owner - Electrical Contractor Megavolt Technical Services (own company) · Self-employed Dec 2023 – Jan 2026 2 yrs 1 mos Ljubovija, Serbia Electrical design and installations, CCTV and low-current systems for commercial and residential buildings; on-site coordination from equipment selection to commissioning.
- Electrical Coordinator - Automation Melim d.o.o. · Full-time Apr 2017 – Jan 2026 8 yrs 9 mos Vršac, Serbia Electrical installation of industrial machines and commissioning on Philip Morris International tobacco factories (Korea, Izhora/Russia, Wilson NC/USA, Bologna/Italy, Netherlands): supervision of switchboard installation and machine wiring, subcontractor coordination, commissioning. Checked and drew control panel documentation before build and commissioning: schematics, panel layouts, field wiring and parts lists.
- Site Coordinator / Process Engineer Comas S.p.A. · Freelance Apr 2022 – Jan 2024 1 yrs 9 mos Bologna, Italy Philip Morris Manufacturing & Technology, Bologna: process engineer and site coordinator on the Training Centre project. Philip Morris Holland: process engineer and site coordinator. Philip Morris Wilson, North Carolina: vice site coordinator.
- Electrical Coordinator Deco Engineering · Full-time Jan 2016 – Mar 2017 1 yrs 2 mos Saudi Arabia Spimaco pharmaceutical factory, Saudi Arabia: electrical works for cleanrooms, HVAC power and controls, installation and programming of fire protection systems, electrical installation and commissioning of production machines. Also residential electrical systems and HVAC electrical installations.
- Electrical Supervisor ETA d.o.o. · Full-time Jun 2011 – Nov 2015 4 yrs 5 mos Serbia Subcontractor for Comas Tobacco Machinery: electrical installation of industrial machines and commissioning on tobacco factories - Philip Morris Izhora (Russia), RNTA Tunis, Philip Morris Malaysia, Philip Morris Indonesia, JTI Sudan.
Education
- Peter the Great St. Petersburg Polytechnic University MSc, Electrical Power Engineering 2021 – 2024
- Peter the Great St. Petersburg Polytechnic University BSc, Automation of Technological Processes and Production 2016 – 2021
Other experience
- Electrical Engineering EBRD / FIDIC infrastructure projects. Preparation of electrical design documentation (calculations, schematics, BoQ, annex packages) for review by the Engineer and international financiers on municipal wastewater and waste management projects in Serbia.
- Site Engineer International site experience - 10 countries, 4 continents. Electrical supervision, process engineering and site coordination on industrial projects for Philip Morris International, JTI, RNTA and Spimaco in Russia, Italy, the Netherlands, USA, South Korea, Malaysia, Indonesia, Tunisia, Sudan and Saudi Arabia (2011-2024): tobacco production lines, a pharmaceutical factory with cleanrooms and HVAC.
- Electrical Design Drafting Started with hand-drawn circuit diagrams before moving to AutoCAD and EPLAN Electric P8 - a background that keeps my schematics readable and consistent for installers and commissioning engineers.
0 followers, 0 following
Joined: October 4, 2026
Last seen: November 4, 2026
Languages
English Full professional proficiency
Italian Full professional proficiency
Russian Native or bilingual proficiency
Serbian Native or bilingual proficiency
Location
Belgrade, Serbia