Job
MEP DETAILED PLANS WITH MATERIAL SCHEDULE
I need drawings for approval and construction, they should come along with detailed shop drawings , materia schedules and bills of quantities
Designer
vinodk6
Mechanical Design Engineer
involved in projects throughout the whole production process. Produce detailed drawings and material schedules which are clear, accurate and cost effective. Ability to work in team & create a collaborative
Designer
hurmatq
Architect and Interior designer
(BIM): Developing high-fidelity models in Revit.Technical Documentation: Generating accurate material schedules and Phase II (detailed) drawings.Advanced Rendering: Producing professional exterior.
Job
Facade Designer
AutoCAD software in delivering Shop Drawing packages for Facade/Curtain wall Projects and prepare material schedules
3. Produce details of facade systems based on architectural designs
4. Review and evaluate
3D Model
Working Drawings
drawings of elements such as pathways, surfaces, finishes, and planting or irrigation systems. Material schedules showing the types of plants, materials, and stones used. Site plans showing the distribution
Job
Cabinet Vision Drafting Must have Cabinet Vision specific experience.
Vision computer that this person can log into so you have access to our custom libraries and material schedules. We typically pay based on a percentage of the job gross and this has worked very well in
Designer
Mdabdul
Machine Design, Microsoft PowerPoint & Mechanical Drafting Professional
▒▒▒▒▒▒▒▒▒▒▒▒▒▒▒▒▒▒ PERSONAL SUMMARY An experienced CAD Technician able to produce detailed drawings and material schedules which are clear, accurate and cost effective. Possessing a proven ability to produce work that
Designer
ahmed_darwish94
Interior Design & 3D Rendering Specialist
practical and ready for construction. My workflow focuses on attention to detail, accurate dimensions, material selection, and consistency between 3D visuals and execution drawings. I am highly proficient in
Job
interior architect
fixed and glass partitions.
4. Flooring & Reflected Ceiling Plan (RCP)
✅
Flooring Plan & Material Schedule
Rubber flooring for weightlifting zones
Wood for group classes
Anti-slip tiles in locker
3D Model
Florida Commercial Pool Plumbing System in Fort Myers, FL
Taylor Technologies K-2006C kit for manual verification twice daily. **D. Plumbing & Piping** • Material: Schedule 40 (SCH40) CPVC for all pool piping. • Layout: o Underground piping encased in concrete conduits