Designer
alih1867
Planning Engineer
Hello! I'm a qualified Planning Engineer with 06 years of experience in project scheduling, delay analysis, and project control using Primavera P6, MS Project, and Excel. I’ve worked with clients in the
Designer
alicivil26
Primavera, Microsoft Project, Planner, Scheduler, Delay Analysis, Project Control. Contracts
planning, scheduling, monitoring and control, extension of time, change control system, forensic delay analysis, cost claims, variations mitigation plans, resource management and dispute resolution gained
Designer
dimitrit1
Full service, short Delay!
create projects for renovation, or for a structural diagnosis of floors, vertical walls and any other analysis of structural deformation or the condition of buildings (facades, etc.). BATI-SCAN can rely on two
Designer
CharlesA Bonin
Have it done right without delay!
Graduated from École de Technologie Supérieure (ÉTS) in Montreal in 2018, from Mechanical Engineering. Involved in multiple students projects (FSAE). Huge motorsports fan. Very Skilled with a good amount of CAD Softwares. Can also...
Designer
baral_bishal86
Mechanical Engineer with expert skills in SolidWorks
software for 3D modelling and I have passed the CSWP exam also. Besides modeling, I also do Product analysis. I always try to use my Engineering knowledge while trying to analyze any designed product. I have
Designer
Tai-Luu-Minh
Mechanical Engineer: Tooling design for Injection mold design and Moldflow analysis in Moldex3D
project I complete. I am a mechanical engineer. I specialize in injection mold design and mold flow analysis by using Moldex3D. I have my unique approach to doing this. I’m not saying I’m the best in this
Blog Post
Common Structural Design Mistakes to Avoid When Hiring Engineering Design Firms
architectural design companies leap to a structural design without performing an entire geotechnical analysis. Others apply canned loads from the building code and overlook the particular characteristics of
Blog Post
How to Improve New Product Timeline to Market in Engineering Development
clever thing to do is to overestimate the timeline; it is better to finish early than to race against delay. Regardless of the timeline you set, it is best to avoid being overly confident with it. Implement
Blog Post
Latest Industry Rates for BIM Services & Building Information Modeling Costs: all you need to know
Cost reduction Critical BIM coordination services include clash detection, scheduling, and cost-analysis features. Essentially, all of these services increase the planning accuracy and reduce the chance
Blog Post
How CAD Technology is Transforming the Future of Architectural Design Services Companies
error could mean several problems at construction time, from material wastage to higher cost and delay. In CAD, the risks associated with such traditional methods are largely diminished through the production