  • Sr. Mechanical Design Engineer (Piping) Maaden · Full-time Jun 2024 – Present 2 yrs 2 mos Al Jubail, Eastern Province, Saudi Arabia -Replacement of new diesel driven fire water pump in Power and utilities plant having modifications in suction and discharge piping
    -Detailed Engineering design of installation of Monoammonium Phosphate pipe reactor having Liquid ammonia, Phosphoric acid and steam lines.
    -Interconnection of Seawater pipelines between Power and utilities plant and two trains of sulphuric acid plant
    -Basic design of receiver and launcher barrels to conduct intelligent pigging for Natural Gas line
    -Several medium & small scale studies and conceptual designs as part of plant and project support
    My responsibilities include but are not limited to:
    -Study of technical issues and resolving with designs modifications.
    -Participation in HAZOP, PSSR and other related meetings.
    -Estimation of engineering packages and projects execution in terms of cost and manhours
    -Networking and collaborating with other engineers and technical staff.
    -Working within the budget to deliver safe and efficient designs on time.
    -Liaising with internal and external stakeholders.
    -Attending meetings and providing input and updates.
    -Communicating within the company and external contractors
  • Technical Assistant Daman Engineering & Services · Full-time Jun 2008 – Jun 2026 18 yrs Lahore, Punjab, Pakistan Served as coordinator for design, fabrication, and erection of telecommunications towers.
  • Lead Engineer Piping Naizak Global Engineering Systems · Full-time Mar 2015 – Mar 2026 11 yrs Al Khobar, Eastern Province, Saudi Arabia Roles and responsibilities:
    • Worked on the in-house design of probes for sample take-off points at various piping for process analyzers.
    • Prepared piping layout & piping isometric drawings.
    • Prepared data sheets & specifications for valves and specialty piping items.
    Projects Delivered:
    • Piping design/engineering of replacement of process analyzers in Aramco Ras Tanura Refinery. This project includes the replacement of 55 analyzers having sample piping transportation lines, probes, and associated accessories. The project execution conducted as per Aramco standards.
  • Senior Piping Engineer Sipchem · Full-time Mar 2018 – May 2024 6 yrs 2 mos Al Jubail, Eastern Province, Saudi Arabia • Piping designed as per below mentioned piping codes and other relevant ASME, ASTM & API codes.
    ASME B31.1, B31.3, B31.4, B31.5, B31.8, B31.9, B31.12 codes.
    • Worked on the stress analysis of piping for various projects as per Sipchem standards. Inter-disciplinary check with process, mechanical, civil, instrumentation and electrical disciplines.
    Roles and responsibilities:
    • Preparation of piping layout & piping isometric drawings.
    • Data sheets & specifications for valves and specialty piping items.
    • Preparation of piping tie-in packages.
    • Analysis of critical piping, generation of stress isometric drawings & final report.
    • Participation in HAZOP sessions & implementation of its recommendations.
    • Selection of spring supports & evaluation of piping supports.
    • Evaluation of piping loads on the nozzles of connected equipment as per allowable loads.


    Projects Delivered:
    • PDH plant debottlenecking project having 30” diameter piping for trim cooler.
    • Sea Water Interconnection line isolation valves.
    • Replacement of waste heat boiler interconnection piping.
    • Piping for installation of propylene heat exchanger.
    • Upgradation of TSO butterfly valve in Acetic acid plant.
    • Upgradation of Recycle acid Piping with AL-6XN material in Acetic acid plant.
    • Interconnecting piping for Ethanol Loading Facility.
    • Distillation Unit Drain Header Extension.
    • Installation of Spare Vacuum Safety Valve for acetic acid plant.
  • Sr. Technical Professional Piping KBR-AMCDE · Full-time May 2014 – Mar 2015 10 mos Al Khobar, Eastern Province, Saudi Arabia • Piping Work Group Leader for Sour water stripper and disposal system in Berri Gas Plant.
    • Performed as Sr. piping engineer for the replacement of process analyzers in Ras Tanura Refinery.
  • Sr. Technical Professional Piping DAR Consulting Engineers · Full-time Feb 2012 – Jan 2014 1 yrs 11 mos Al Jubail, Eastern Province, Saudi Arabia • Piping Work group leader for BLCT Phase-II project for the engineering & design of piping system for chemical handling stations for truck and ship loading at Commercial port Jubail. Major responsibilities included vendor quotes evaluations, inter-disciplinary checks, engineering document management, existing documents retrieval and client meetings.
    • Worked on Isobutane synergy project. Engineering/design of pipeline systems for transportation between two plants. Detailed Engineering Package included piping layout plans, pipe wall thickness calculations, piping isometrics, material take-off & piping supports as per relevant ASME/ASTM/API codes and standards. During detailed engineering major responsibilities were inter-disciplinary checks, client coordination, drawings documents management, existing documents retrieval and client meetings.
    • Piping engineer for modification of mixed butane line to install an additional control valve. Mechanical package included piping layout plans, pipe wall thickness calculations, piping isometrics, and material take-off.
  • Engineer Piping Presson Descon International (Pvt.) Ltd. · Full-time Dec 2008 – Feb 2012 3 yrs 2 mos Lahore, Punjab, Pakistan • Worked on the 3-phase high, medium, and low-pressure separators, the HP separator having 40mmscfd gas, 14,500 BPD oil and 500 BPD water flow rates.
    • Worked on modification of prod. Water lines of 3-phase separator. Detailed engineering included piping layout plans, pipe wall thickness calculations, piping isometrics, and material take-off.
    • Developed IFC package for the Gas processing plant according to the specifications as per relevant ASME/ASTM/API codes and standards.
    • Checking and reviewing the piping isometric drawings, piping layout plans and material take off received from the detailed engineering contractor.
    • Cost & man-hours estimation for engineering packages of flowlines and trunk-lines, TEG dehydration unit and various units of gas processing plant for techno-commercial bid preparation.
    • Served as department representative for internal & external audits of the department.
    • Trained the engineers and designers to use the CAD Worx Plant Professional.
  • Technical Assistant Daman Engineering & Services · Full-time Jun 2008 – Dec 2008 6 mos Lahore, Punjab, Pakistan Served as coordinator for design, fabrication, and erection of telecommunications towers.
    • Maintained record of mechanical/piping drawings and documents and prepared them for client submission.
  • Piping Design Engineer SPEC (Pvt.) Ltd. Lahore · Full-time Mar 2006 – Jun 2008 2 yrs 3 mos Lahore, Punjab, Pakistan • Piping layout and isometric drawings for skid packages in accordance with relevant ASME/ANSI/BS/API and ASTM codes & standards.
    • Worked on the interconnecting of units and equipment of 30 mmscfd and 60 mmscfd gas processing facilities.
    • Maintained record of mechanical/piping drawings and documents and prepared them for client submission.