Global rank:
35,075 / 151,718
Skill pts: 5

About

... more » « less

Experience

  • Operations Manager Uçar Naturalgas A.Ş · Full-time Sep 2021 – Aug 2026 4 yrs 11 mos Bursa, Türkiye Managed end-to-end design and production workflows for natural gas pressure reducing and measuring stations
    (PRMS), from offer and engineering to shipment.
    ● Directed ASME Sec. VIII pressure vessel manufacturing, maintaining strict quality control, CE documentation, and
    PED compliance.
    ● Coordinated SolidWorks-based 3D design and AutoCAD Plant 3D technical drawings and piping isometrics across
    engineering teams.
    ● Led CE documentation processes for high-pressure, high-capacity natural gas vessels — one of only two
    manufacturers in Turkey meeting this standard.
    ● Optimized production scheduling and cross-functional workflows, improving project delivery timelines.
  • Project Manager Pietro Fiorentini Turkey · Full-time Aug 2019 – Jul 2026 6 yrs 11 mos Bursa, Türkiye Engineered design and production of natural gas stations using SolidWorks and AutoCAD Plant 3D, improving
    operational efficiency.
    ● Led ASME pressure vessel design and manufacturing projects adhering to international safety standards and PED
    requirements.
    ● Coordinated NDT/NDI follow-up and inspection processes, ensuring full industry compliance.
    ● Covered Sales Manager responsibilities (12 months): cost estimation, client relations, and commercial negotiations.
    ● Played key role in post-acquisition integration (Pietro Fiorentini acquired Gemsat), ensuring workflow continuity
    and team alignment.
  • MECHANICAL DESIGNER Gemsat Gas Equipment A.Ş., Bursa, Turkey (Fiogaz) · Full-time Nov 1998 – Jul 2026 27 yrs 8 mos Bursa, Türkiye Designed natural gas stations, pressure vessels, PIG launchers/receivers, and filtration systems from concept to
    production using SolidWorks and AutoCAD; responsible for full technical drawing packages and BOM
    documentation.
    ● Developed capacity calculations, piping isometric drawings, equipment selection, and ASME B31.8 / API 5L
    compliant piping designs for gas infrastructure projects.
    ● Designed and manufactured a custom automatic welding machine in-house (2019), replacing a planned
    commercial purchase and significantly reducing costs.
    ● Served as Quality Manager (2004–2006): implemented ISO 9001 and ISO 45001, conducted internal audits and
    corrective actions.