Contest Easy to Assemble Equipment Stand, 400lbs rating
We are looking to design an equipment stand for mini-split air conditioners that is easy and quick to assemble. It will be an outdoor stand, so it must withstand the weather, and hold up to 400lbs. Currently the market leader is...
Designer civil solutions
"A good rating demands some work to be given to me"
I am civil engineer having 3 years of experience as "Estimation Engineer". I can do material takeoff and cost estimation works for your building projects using tools like Plan swift and MS excel. Do contact for the quality services.
CAD Design Civil Engineering Civil Takeoffs Construction Drawings Costing and Estimation Design & Drafting Estimation Material Cost Estimation Material Take Off Engineering MEP Takeoff Microsoft Excel PlanSwift Quantity Take-Offs (QTO)
Knowledge Base Why was my design entry declined or receive a low star-rating?
Regardless of talent, active designers will occasionally receive a low star rating or have an entry declined by a client. Table of contents [toc] Declined entries Usually, clients can’t leave feedback
Knowledge Base What if I don't like a design entry?
helpful function to shortlist designer submissions (screenshot below). Low star-rating: You can assign a low star-rating to a design entry (1-5 stars) and use the Sort By drop-down to view your favorite
3D Model Test driver
I created Test driver ..in multicolor....view this and give rating !!
3D Model table-langer
Thanks Hi All, Please give a rating from 1 to 5
Knowledge Base Can I ask a designer to revise their entry?
specific designer by clicking the Designer entries link next to a design entry.Star rating: You can assign a Star Rating for any design submission which lets a designer know if they’re on the right track
3D Model Power Electronics Casing
designed in solidworks and die cating process It has fins for thermal satbility purpose it has ip67 rating
3D Model Roll Lifting Device
analysis was completed we determine the appropriate load rating for the system and complete regulatory welding inspections and applied the load rating to the system. WHAT OUR TEAM PROVIDED: Definition of operation
3D Model ROLL LIFT DESIGN
analysis was complete we determine the appropriate load rating for the system and complete regulatory welding inspections and applied the load rating to the system. - Definition of operation - CADing of existing