3D Model
Management structural Building
Discipline: Structural Model Status: Coordinated Level of Development: LOD 300–350 🏗️ Overview: The Management Building is the structural model representing the administrative or central operations facility
3D Model
Design-Assist & Record BIM for a Data Center Project in Ireland
between construction completion and operational handover • Need for continuity between coordination models and final record BIM • The client required a reliable, operational-ready record model at closeout
Designer
elizad
Revit BIM//Solidworks/AI/Python
workflows. I support projects from concept to construction to fabrication, delivering accurate BIM models, architectural design, mechanical components, technical drawings, CAM toolpaths, and manufacturing-ready
Designer
bimaid
MEP BIM Specialist | Revit HVAC Modelling | 2D CAD Drawings | Shop Drawings | Clash Coordination
— from concept through to construction issue. What we deliver: ✔ Revit HVAC and mechanical 3D models (LOD 200–400) ✔ Coordinated 2D MEP CAD drawings from PDF, AutoCAD, or sketches ✔ Fabrication and shop
3D Model
MEP BIM Coordination for a Data Center in Ireland
center–specific BIM Execution Plan, aligned with ISO 19650 and client standards • Delivered coordinated LOD 350–400 BIM models, with a strong focus on high-risk MEP zones • Implemented weekly, KPI-driven coordination
3D Model
BIM Coordination for a Commercial Project in the UK
Project phase: Design + Construction • BIM services: Multidisciplinary BIM coordination, 4D-ready models, drawing production • Disciplines: Architecture, Structure, MEPF • Software: Revit, Navisworks, ACC
Designer
dkubay
3D modeller, lead environment artist
including hundreds of models, terrain, lighting, particle effects, and weather simulation if necessary. While I create important scene materials myself, I make sure all models, materials, and textures
3D Model
Process & Utilities BIM Coordination for an Industrial Facility in the USA
accurate routing and constructibility from the outset Our BIM Approach • Developed coordinated LOD 300–400 BIM models covering process, utility, and supporting systems • Applied zone-based control and process-specific
3D Model
Structural BIM Coordination for an Industrial Project in the USA
BIM that directly supported fabrication and site erection Our BIM Approach • Developed LOD 400 structural BIM models suitable for fabrication and coordination • Established strict version control and model
Designer
Cesar_Fruto
3D Architect | Design, Visualization & Branding Expert
and developers communicate their ideas clearly and professionally. I turn concepts into accurate 3D models and impactful visual presentations that enhance the value and understanding of every project. In