Microsoft Excel, Civil Drafting & msproject 2.013 Specialist
Kenya
Hi there,
I am a civil engineer by training and love BIM designs. Success for me is being able create a system that outlives me. That is why i like the built environment.
Solid work 2014, 3D Design & msproject 2.013 Specialist
Cairo,
Egypt
I Have Extensive Experience In Manufacturing Engineering Technology Development And Using,Autocad2017,Inventor 2017, Primavera 6 and Ms Project And Also I’m Fluent In Italian ,...
Design Engineer with CATIA V5, Solidworks, and AutoCAD experience.
Sгo Paulo,
Brazil
Design Engineer, with a large experience in the engineering design sector, with an emphasis on the development of aircraft structures. I worked mainly in the development and of met...