naveenk3
Global rank:
10,394 / 50,819
Skill pts: 5
Hire / Invite to Project

About

 Professional having exposure in procurement assistance from concept to commissioning including preparation of P&IDs, specifications, control philosophy, bid evaluation and Thermal Performance Evaluation of complete Coal and Gas cycle power plant and auxiliaries.
 System engineer for Power plant assets like Boiler, HRSG, Gas Turbine, Steam Turbine and Auxiliaries, Condenser, CEP, SJAE, CWBP, Aux Boiler, Fuel Gas System, Fuel Oil System, , Flash tanks, Heat Exchangers, pumps, compressors and the responsibilities include
 Preparation of Heat balance models, performance test procedures and evaluation of performance data of site.
 Familiar with the codes and standards like ASME, ASTM, API, HEI, TEMA NFPA, EJMA, AWWA, PED etc
 Gas Turbine Service Engineering –System Engineering for GT auxiliaries, Thermal Performance evaluation and site issue resolutions. ECO for Gas Turbine Auxiliaries and BoP. Expertise in SAP and PLM2020 and COMOS.

3D Models

Stats

Joined: December 24, 2021

Last seen: December 24, 2021

Location

India