Arman A.
Mechanical Engineer- Fire fighting and Fire Alarm
About
I have knowledge of NFPA standards, sprinkler hydraulic calculations, pump head calculations, and MEP coordination. I can assist with AutoCAD drafting, PDF-to-DWG conversion, drawing revisions, and MEP layout preparation.
I am committed to delivering accurate drawings, maintaining quality, and completing projects on time.
Experience
-
SITE ENGINEER
Himal Refrigeration · Full-time
Feb 2026 –
Present
9 mos
Kathmandu, Bagmati Province, Nepal
Himal Refrigeration and Electrical industries Pvt. Ltd. — Kathmandu, Nepal | Project: Ministry of Rural and Urban Development Project, Nawalpur,
Nepal | Feb 2026 – Present
• Supervise and coordinate MEP installation and execution activities at site.
• Coordinate firefighting, fire alarm and HVAC work with contractors and other MEP disciplines.
• Monitor installation of firefighting piping, sprinkler systems, hydrants, valves and related components.
• Review MEP drawings and coordinate site installation according to approved layouts and project requirements.
• Support fire protection system calculations, material requirements and technical coordination.
• Coordinate HVAC ductwork, equipment placement and routing with electrical, plumbing, structural and architectural services.
• Monitor contractor workmanship, material installation and site progress; identify and resolve coordination issues.
• Assist in inspection, testing and commissioning activities and maintain required site documentation. -
Site Engineer
Zerone Technologies pvt. ltd. · Full-time
Aug 2024 –
Feb 2026
1 yrs 6 mos
Gurgaon, Uttar Pradesh, India
Zerone Technologies Pvt. Ltd. — Gurgaon, India | Project: The Moxy by Marriott, Kathmandu, Nepal | Aug 2024 – Feb 2026
• Supervised and coordinated MEP site activities with major exposure to Fire Fighting and Fire alarm and Public Addressing System.
• Executed firefighting works including sprinkler piping, hydrant systems, valves and associated accessories as preapproved drawings
and project requirements.
• Supported sprinkler system installation and layout coordination with other MEP services.
• Assisted with fire protection hydraulic calculations and fire pump calculations for project requirements.
• Coordinated fire alarm system installation, including detector layouts, cable routing and device installation.
• Coordinated HVAC activities include duct routing, equipment placement and site execution.
• Reviewed drawings and coordinated MEP services with architectural and structural requirements to minimize site clashes.
• Supervised contractors/subcontractors and monitored manpower, materials, quality and daily site progress.
• Provided technical guidance to site teams and assisted in resolving MEP coordination issues.
Education
- Vishveshwarayya Technical university B TECH, Mechanical Engineering, 7.59 2020 – 2024 Activities and Societies: Cricket, Mechanical society of Innovation
- Email address
0 followers, 0 following
Joined: November 16, 2026
Last seen: November 16, 2026
Languages
English Professional working proficiency
Urdu Limited working proficiency
Hindi Full professional proficiency
Nepali Native or bilingual proficiency
Location
Kathmandu, Nepal