Khaji A.
Global rank:
15,915 / 133,950
Skill pts: 5
3D Modeling and Drawings AutoCAD Mechanical 2026 Autodesk Navisworks Manage 2025 HVAC Calculation Design Revit MEP

About

... more » « less

Experience

  • BIM Lead Atkins Realise · Full-time Jun 2023 – Present 2 yrs 11 mos India Led BIM delivery for 4 water pump station projects, coordinating 10 cross‐disciplinary teams and completing model deliverables 5% ahead of schedule while reducing rework and coordination costs by 20% through for SD submission , optimized clash detection and standardized BIM workflows.
    BIM coordination for the Saadiyat Island Development, ensuring adherence to ISO 196501 , 2 & 5 , LOD BIM forum 2021 standards and optimizing 3D model deliverables.
    Spearheaded BIM coordination for the Security Forces Medical Centre KSA) project, ISO ISO 196501 , 2 compliance and delivering models.
    BIM coordination for Saudi Entertainment Projects KSA, ensuring adherence to ISO standards and optimizing 3D model deliverables.
    Spearheaded BIM coordination for the Dubai Metro Green Line project, ensuring adherence to ISO standards and optimizing 3D model deliverables.
    Managed BIM coordination for the Grove Plot-3,5,7,9 project in Abu Dhabi, ensuring adherence to ISO 196502 and LOD BIM forum 2019 standards and optimizing 3D model deliverables.
    Spearheaded BIM coordination for the Whitchurch WSW project.
    Spearheaded BIM implementation strategy and cross‐disciplinary collaboration for the Al Gurm House project, ensuring full compliance with ISO 19650‐12018, ISO 19650‐22018, ISO 19650‐52020, and BS 11922007A22016. Established governance frameworks, streamlined and adapted information management procedures, and optimized 3D model deliverables to enhance coordination efficiency and project-wide digital integration.

    Managed BIM coordination for the Al Wajh Airport Terminal Expansion & Refurbishment project, ensuring adherence to ISO 196501 2018
    ISO 19650 22018
    IS0 196505 2020 Part 5
    LOD BIM forum 2021 standards.
    Managed BIM coordination for the MISK AI Mishraq project, ensuring compliance ISO 196501 2018 ISO 19650 22018
    IS0 196505 2020 Part 5
    LOD BIM forum 2021 standards and deliverables.
    Managed BIM implementation and cross‐disciplinary coordination for the Ramhan Island utility infrastructure, ensuring strict compliance with ISO 19650‐12018, ISO 19650‐22018, ISO 19650‐52020, and LOD BIM Forum 2022 standards. Collaborated with engineering, architectural, and client teams to optimize 3D model deliverables across the
    Potable Water
    Recycled Water
    Sewage Water, and Storm Water Pumping Stations.
    Facilitated structured information workflows, conveyed design intent clearly to all stakeholders, and demonstrated strong adaptability in aligning diverse project requirements within a unified BIM execution framework.
    Led BIM coordination and digital design delivery for the RP Tower development, effectively communicating technical requirements and collaborating with multidisciplinary teams to maintain model accuracy and design integrity. Conveyed complex design intent to stakeholders through clear visual documentation and review sessions, while demonstrating adaptability in managing evolving project constraints and integrating late‐stage design changes within the BIM workflow.
    RAK Senior Living Oversaw BIM implementation and coordination ensuring seamless collaboration across architectural, structural, MEP, and facilities‐planning teams. Communicated BIM standards and workflows to stakeholders, conveyed design and coordination insights through structured model reviews, and showcased strong adaptability in aligning BIM outputs with operational, accessibility, and senior‐care design requirements.
  • BIM Coordinator MEP RELIANCE CONTRACTING CO. · Full-time Feb 2019 – Nov 2023 4 yrs 9 mos United Arab Emirates PROJECTS :
    1. Act 1&2 Residential Tower & B1,B2 Car Parking Dubai Downtown Dubai
    Plan and prioritize tasks for self and team members to meet deadlines.
    Using BIM 360 as a common data environment, publishing and consuming models. Walkthrough with All the Discipline Leads, creating viewpoints and issues. Exporting NWC les using Clarity server and creating clash detection report. Creating a dashboard for clash detection to identify the clash numbers.
    Plan and work according to the site change of work as per the site requirements.

Education

  • Government Polytechnic Diploma in Mechanical Engineering, General Mechanical Engineering, Second Class 2006 – 2010

Licenses & Certifications

  • ISO 19650 1&2 Project Delivery BSI Jan 2026 – Present

Stats

Joined: May 26, 2026

Last seen: May 27, 2026

Languages

English Professional working proficiency

Hindi Full professional proficiency

Location

Bengaluru, India

Bengaluru, India