Sherif Abdelmagid

EG Egypt

Rank:
1619 / 12388
Score: 5

Sherif Abdelmagid hasn't submitted any design yet.

About

Sherif Mohamed Abd El-Nour Abd El-Magid                            

Piping Designer

Sr. Cad Designer

 _________________________________________________________________________________

 OBJECTIVE:

Seeking a Challenging Career in a Petroleum (Oil & Gas) or Construction Company Whereby My Designing and Drafting Background, Previous Work Experience,

and Managerial Skills can be Applied.

 

PERSONAL INFORMATION:

Date of Birth:     17-1-1970

Address:             20 Mohamed El-Sayed Hyba from Abu El-Fadel St., 

    El-Zawia El-Hamra, Cairo. Egypt.

Military Status: Finished

Marital Status:  Married

Nationality:        Egyptian

Religion:             Moslem

 

EDUCATION:

Diploma of Industrial Technicality, Mataria Institute of Industrial Technique

Department:             Mechanical

Graduation Date:     May 1992

Overall Grade:         Good

 

LANGUAGE SKILLS:

Arabic:  Mother tongue

English: Very good command of both written and spoken

 

 

 

 

PROFESSIONAL SKILLS:

 

  • Familiarity with International codes & standards.

 

  • 18 YEARS EXPERIENCE IN THE FIELD OF MECH. WORKS DESIGN

            AND DRAFTING INCLUDES:

  • EQUIPMENT ORIENTATION (following Data Sheets).
  • PIPING ROUTING (following P& ID's) FOR EQUIPMENT

SUCH AS PRESSURE VESSELS, TANKS, TOWERS,

EXCHANGERS AND PUMPS.

  • SITE LAYOUTS AND PLOT PLANS DRAWINGS.
  • PLANS, SECTIONS & DETAILS DRAWINGS.
  • SHOP DRAWINGS.
  • ISOMETRICS AND BILL OF MATERIALS.
  • MECHANICAL DRAWINGS FOR MACHINE ROOMS.
  • UNDERGROUND DRAINAGE NETWORKS.
  • TREATMENT STATIONS.
  • ANIMATION FOR MORE DETAILS AND REPRESENTATION.

______________________________________________________________________________________

 

COMPUTER SKILLS:

 

·         Very good Knowledge of Computer Hardware.

·         Very good Knowledge of Various Operating Systems (DOS / Windows )

·         Very good Knowledge of Many Applications Running Under

Microsoft Windows (Including Microsoft Office Applications).

·         Very good  Knowledge of PDS system.

·         Very good  Knowledge of PDMS system.

·         Very good  Knowledge of Smartplant Review.

·         Very good  Knowledge of ORTHOGEN.

·         Very good Knowledge of MICROSTATION Program (2D - 3D).

·         Excellent Knowledge of AutoCAD Program (2D - 3D).

·         Very good Knowledge of CADWorx Application.

·         Good Knowledge of AutoPLANT Application.

·         Good Knowledge of PlantSpace Application.

 

______________________________________________________________________________________

 

 

 

 

 

 

 

 

 

 

WORK EXPERIENCE:

 

I WORK FORCB&I Lummus L.L.C.

Position: Sr. PIPING DESIGNER & LEAD CAD DESIGNER

Dec. 2010 – Present

Member of Reficar project design group

(PDS, ORTHOGEN, MicroStation & AutoCAD).

Tasks Accomplished Included:

·         Preparing 3D-Equipment Models (following Data Sheets).

·         Preparing 3D-Piping Models (following P&ID).

·         Preparing Supports in Models for Stress Analyses review.

·         Extract and Check ISO's.

·         Coordinate with Process Dep. To reroute lines according to P&ID updates.

·         Coordinate with Stress Analyses to achieve optimum supporting and routing as possible.

 

TEAM LEADER

Tasks Accomplished Included:

·         Extract 2D by DRAWING MANAGER MODULE.

·         PRODUCE DWG & DGN FORMATS WITH ORTHOGEN.

·         FINISH AND COMPLETE 2D WITH FULL DATA AND DETAILS

            by AutoCAD & MicroSTATION.

 

 

I WORKED FORCB&I Houston

Position: Sr. PIPING DESIGNER

July 2010 – Dec. 2010

Member of Reficar project design group (PDS, Microstation & AutoCAD).

Tasks Accomplished Included:

·         Preparing 3D-Models by PDS (included P&ID and Data Sheets).

·         Clash Check Reports.

·         Extract ISO's

·         Extract 2D with DWG & DGN formats by ORTHOGEN.

·         FINISH DRAWINGS WITH FULL DATA AND DETAILS.

 

 

 

 

 

 

 

 

I WORKED FORCB&I Lummus L.L.C.

Position: Sr. PIPING DESIGNER

Aug. 2007 –July 2010

Participated in NAGARJUNA project (PDMS & AutoCAD).

Tasks Accomplished Included:

Member of NAGARJUNA Project team, Participated in Preparing                                     the Modeling as following:

- Check Conditions for lines to update from latest Line List.

- Check Clashes for lines to release it from Model.

- Coordinate with Stress Analyses to achieve optimum

   supporting and routing as possible.

- Coordinate with Process Dep. To reroute lines according to  

   P&ID updates.

- Coordinate with Instrumentation Dep. To update Sets and

   Hook-Up’s.

- Coordinate with Electrical Dep. To arrange locations of

   Lighting Devices.

- Extract ISO’s for Checking.

______________________________________________________________________________________

 

I WORKED FORHEAVY ENGINEERING INDUSTRIES AND

SHIPBUILDING CO. (K.S.C)

Position: PIPING DESIGNER

Apr. 2006 – Jun 2007

PARTICIPATE IN SEVERALJOBS FOR K.O.C

Tasks Accomplished Included:

·          Preparing Equipment Orientation.

·          Preparing Equipment Piping.

·          Preparing Piping Routing.

·          Preparing Pipelines Networks.

·          Preparing Mechanical Drawings & Details.

·          Plot Plans.

·          Site Layouts.

·          Piping Plans & Sec's.

·          Piping Isometrics & MTO.

·          3D View Perspective.

·          Modeling & ISOgen.

____________________________________________________________________________________

 

 

 

I WORKED FORSIEMENS Industrial Solutions and Services.

Position: PIPING DESIGNER

Sep. 2004 – Mar. 2006

Participated in EAST DELTA piping treatment project

And other Electromechanical Projects

Tasks Accomplished Included:

·           Preparing Mech. & Piping Works.

·           Preparing SECTIONS & DETAILS.

·           Preparing ROUTING OF PIPING NETWORKS.

·           Preparing ISOMETRICS & MTO.

·           Preparing SHOP DRAWINGS.

______________________________________________________________________________________

 

I WORKED FORSAUD CONSULT EL KHOBAR.

Position: CAD SUPPORT

Mar. 2003 – Feb. 2004

Participated in KHAFJI project forARAMCO

Tasks Accomplished Included:

·           Preparing DRAWING PLANS.

·           Preparing SECTIONS & DETAILS.

·           Preparing ISOMETRICS & MTO.

·           Preparing SHOP DRAWINGS.

·           Repairing and Converting for DGN & DWG files.

·           Trainer ( MicroStation ).

______________________________________________________________________________________

 

I WORKED FORENPPI

Position: PIPING DESIGNER

May 2001 – Mar. 2003

Participated in Several Petroleum & Industrial Projects

Tasks Accomplished Included:

·           Preparing Equipment Orientation & Piping (Vessels, Towers, Tanks, etc.).

·           Preparing Piping Routing for Networks.

·           Preparing Modeling.

·           Preparing Mechanical Drawings for Pump Stations.

·           Preparing Shop Drawings & Details.

·           Plot Plans.

·           Site Layouts.

·           Piping Plans.

·           Piping Isometrics & MTO.

_____________________________________________________________________________________

 

 

 

 

 

I WORKED FORABBpetroleum

Position: PIPING DESIGNER & Sr. MECH. DRAUGHTSMAN

Apr. 2000 – Apr. 2001

Participated in ACPA project

Jobs Accomplished Included under & above ground:

·           Preparing Underground Oily Piping Design System.

·           Preparing Details.

·           Preparing Piping General Arrangement of Tanks Farm.

·           Preparing Piping Isometrics & MTO.

 

______________________________________________________________________________________

 

 

I WORKED FOR ZUHAIR FAYEZ Misr

Position: MECH. DRAUGHTSMAN

Jan. 98 - Apr. 2000

Participated in many of Electromechanical Projects

Tasks Accomplished Included:

·           Preparing DRAWING PLANS.

·           Preparing SECTIONS & DETAILS.

·           Preparing ISOMETRICS & MTO.

·           Preparing IRRIGATION SITE LAYOUTS.

 

______________________________________________________________________________________

 

 

I WORKED FORSAUD CONSULT Misr

Position:MECH. DRAUGHTSMAN

Jan. 96 - Dec. 97

Participated in many of Electromechanical Projects

Tasks Accomplished Included:

·           Preparing DRAWING PLANS.

·           Preparing SECTIONS & DETAILS.

·           Preparing ISOMETRICS & MTO.

·           Preparing SHOP DRAWINGS.

·           Preparing 3D-DRAWINGS.

 

______________________________________________________________________________________

 

 

 

 

 

 

 

 

I WORKED FOR GARNO Misr

Position: PIPING, MECH. DRAUGHTSMAN

Jan. 95 - Dec. 95

Participated in KHARGA treatment stations

Tasks Accomplished Included:

·           Preparing DRAWING PLANS.

·           Preparing SECTIONS & DETAILS.

·           Preparing ISOMETRICS & MTO.

·           Preparing SHOP DRAWINGS.

·           Preparing 3D-DRAWINGS.

______________________________________________________________________

 

Time Before

I Worked For Different Companies As a Beginner Under Training.

 

______________________________________________________________________