About
Study of CAD panel data, Spot Detail information(NO. Of SPOT’s and spacing).
• Assembly sequence definition, weld balancing, Gun selection, etc.
• Developing of Mylars and pin location and respectively whole unit according to given PLP.
• Selection of bought out items like pneumatic or toggle clamps,bearing screw,LM rail,etc.
• Design and detailing of welding fixtures on CATIAV5.
• Co-ordination with the customer estimating work and Co-ordination with team members.
• Handled Quality checking and delivered all design data as per customer requirement.
software expert-CATIA V5,UG NX,jEDWIN PDM,BOMTOKSL,FM-STULI,DAIMLER SLE
... more »
« less
Experience
-
Group leader
EDAG Enggneering and Design(I) Pvt Ltd. · Full-time
Oct 2008 –
Present
17 yrs 6 mos
Pune, MH, India
Senior BIW Fixturing Group Leader with 17+ years of end-to-end experience — from process planning and concept design through to 3D/2D delivery and manufacturing data release — for the world's most demanding German OEMs: Volkswagen, BMW, Audi, and Daimler / Mercedes-Benz. Expert in CATIA V5 and Siemens NX. Proven leader who built and ran a dedicated BMW engineering team of 8–10 engineers in Pune, with direct interface to German client teams. Six overseas assignments in Germany (Fulda & Eisenach), including a formal Work Permit engagement, underline a level of technical credibility rare in Indian engineering centres.
Education
-
SHIVAJI UNIVERSITY
Bach of engineering, Production, 1st Class
2002 – 2006
Activities and Societies:
Paper Presentation