Global rank:
11,558 / 121,026
Skill pts: 5

About

... more » « less

Experience

  • Development manager Flagmore AS · Full-time Mar 2019 – Present 6 yrs 10 mos Kose, Harju County, Estonia I design and improve new products made form glass fiber reinforced material. I create more efficient solutions for production.
  • Design engineer AS Flebu · Full-time Jan 2019 – Mar 2023 4 yrs 2 mos Tallinn, Harju County, Estonia Designing of industrial and offshore fans and various special solutions (non-standard impellers and special solutions, platforms, etc.). I implemented more technologically effective solutions, primarily relying on my knowledge and experience of sheet metal processing and assembly technologies. One of the most special projects was a 10t tall ventilator with platforms.
  • Engineer ABB AS · Full-time Jun 2014 – Jan 2019 4 yrs 7 mos Jüri, Harju County, Estonia Responsibilities included developing new solutions and supporting the product portfolio and improving. I guided the assembly of new products and solutions and, if necessary, helped with their preparation. I am proactive in implementing new solutions in production, which helps to get the best feedback on the work done. I consider it important to have the most accurate information exchange between the customer, engineers and production.
  • Design Engineer Te Energy · Full-time Oct 2007 – Oct 2010 3 yrs Tallinn, Harju County, Estonia Designed switchgear and retrofit solutions for the power substations. My activities included the creation of new details, assemblies and drawings. I looked for new technological solutions to improve the products and ensured their implementation. Extensive knowledge of sheet metal production (stamping, application, assembly, welding, etc.) acquired in a previous job is definitely helpful. Work tools are Autodesk Inventor, Vault and Autocad.
  • Technologyst AS Favor / Estonia · Full-time Jun 2007 – Oct 2010 3 yrs 4 mos Tallinn, Harju County, Estonia Development and improvement of technologies for products (tools and constructive solutions). I was responsible for the project of air conditioning frames to be placed in railway wagons and the technological part of the production of various other smaller projects. Maintaining, supplementing and updating the technical documentation used is very important.