Designer
Civil_IA
Civil engineer with storm water management and grading expierence.
drafting (C3D) expierence. Large civil development, grading with storm water managment, domestic waste water, and geotechnical background.
3D Model
Recycling plant platforms, equipment and other fabrications
Designed and produced production drawings for various plant and platforms for recycling of different waste materials. All projects resulted in successfully being implemented.
3D Model
3 Tonne Mixing Machine
Mixing machine to process 3 tonne batches of waste product with Automatic bagging machine. Once mixed the product feed up a screw conveyor
3D Model
API 650 TANK
EQUIPMENT: ISO STORAGE TANK CAPACITY: 50000 LITRES APPLICATIONS: WASTE ENGINE OIL CLIENT: www.▒▒▒▒▒▒▒▒▒▒▒▒▒▒ DESIGN DURATION: 2D: 2 HOURS 3D: 2 HOURS SOFTWARE: AUTOCAD & SOLIDWORKS
Designer
jeffu
Mechanical Engineer -BricsCAD,SOLIDWORKS, INVENTOR
Steel, welding, plastic fittings, chemical mechanical engineering design for industrial waste plants BricsCAD - 2 yrs Inventor - 1 yr Solidworks - 2 yrs AutoCAD - 5 yrs
Designer
ealain_design
Chartered Mechanical/Nuclear Engineer with Solidworks Expertise
systems - Wastewater and water treatment process systems using ozone and oxygen gas injection and generation systems - Process systems and mechanical components for use in the nuclear industry (waste treatment/encapsulation)
3D Model
Destilator
Destilator for distilation process used to heat plastic waste with a certain temperature so that it can produce esense in the form of gasoline, diesel, kerosene.
Designer
EcoFriendlyBoxes
Eco-Friendly Boxes
sustainable future for the packaging sector and the earth by emphasizing sustainability, reducing waste, and encouraging innovation.
3D Model
Mowby Lawnmower Robot
movement. It features an extended arm mechanism that is positioned over the waste bin, suggesting its capability to dispose of waste autonomously.
3D Model
Multi-Pit Nickel Mine Design – Ore Clusters, Pits, Dump & Roads
76 Mt @ 1.76% Ni), with 13 automatic ramps (15 m, 8%), waste dump, ROM and low-grade stockpiles, haul roads and a 3-year schedule where Pit 2 waste backfills Pit 1. Built in Python from the Surpac block