Multi-Pit Nickel Mine Design – Ore Clusters, Pits, Dump & Roads
Alternative mine design for a nickel laterite deposit: instead of one large pit, ore columns with a strip ratio of 1.2 or less were grouped into clusters and designed as two pits.
Result: 24% less excavation (4.49 vs 5.92 M BCM) and a higher head grade (2.76 Mt @ 1.76% Ni), with 13 automatic ramps (15 m, 8%), waste dump, ROM and low-grade stockpiles, haul roads and a 3-year schedule where Pit 2 waste backfills Pit 1.
Built in Python from the Surpac block model; delivered as Surpac strings and DXF. Training dataset, not a client project.
Published