Designer
Nimesh Prajapati
AutoCAD & CAD Design Specialist
specifications of HVAC Systems • Preparation of Technical specification of equipment like AHUs, FCUs, Pumps, Chillers etc. • Coordination between Client / Consultant & Vendors • Technical Bid Analysis • Vendor Documents
Designer
Andrew_Wall
Mechanical Engineer
Experience sizing, selecting, and implementing all types of chilled water systems on projects (e.g. Chillers, Coolings Towers, Fluid Coolers, Pumps, Heat exchangers, ect.) • Knowledge implementing energy efficiency
3D Model
Design of Mechanical Electrical and Plumbing MEP System
Revit. Mechanical 1. Complete HVAC System Design (Heating and Cooling Load Calculations, Layouts, Chillers, Split System and more) 2. Detailed Plumbing System Designs (Water Supply & Drainage Layouts, Septic
Designer
maftabkhan
Mechanical Design Engineer
Report • Ventilation Calculation Report • Split Units • Manual J, D, and S • VRF System Design • Chillers • Air Conditioners • Cooling Towers • Kitchen Hood Ventilation • Heat exchangers • Takeoff Sheets
Designer
planora
3D Architectural, Civil & Steel Structural Engineer
Engineer | Tekla, MEP & HVAC Design, I ensure: 1. Structural systems properly support HVAC ducts, chillers, boilers, and piping 2. Accurate load consideration for mechanical equipment 3.Clean coordination
Designer
Allabaksh
Mechanical Design Engineer/ HVAC Design Engineer
system. • Chilled water pumps, condenser water Pumps Selection and power calculation. • Selection of Chillers, AHU’S, FCU’S, Exhaust Fan, Blower, Window AC, Cooling Tower, Desert Cooler and other Equipment’s
Designer
steffenh1
Mechanical engineer with Inventor, Solidworks, Ansys CFX and Labview experience
multi skilled professional engineer. Doing CAD as well as PLC programming, CFD and FEA analysis, Labview programming and testing. Collected lots of experience with chiller design recently as well as chiller testing and oil free compressors
Designer
Ahing
CAD DESIGN / MECHANICAL DESIGN / HVAC / THERMO-ENERGY SYSTEMS
PROTECTION /SPRINKLER SYSTEMS, BOILER ROOM / POWER PLANT, HEAT CHANGE STATION, CLIMATE CHAMBER, CHILLERS, HEAT PUMPS, COMPRESSOR STATIONS, GAS STATIONS, SPRINKLER STATIONS, WARM WATER PIPELINE, HOT WATER
Designer
Brian S.
MEP BIM Coordinator / Owner
10+ years’ in the Mechanical Construction Industry – encompassing Pipefitting, Welding, Field Supervision, BIM Coordination and Project Management positions Management of projects exceeding five million dollars in single contract...
Blog Post
What Are MEP Design Costs, Drafting Fees & Engineering Service Rates for Companies?
principles to increase work efficiency. For example, specific MEP equipment such as boilers and chillers are among the most expensive and costly. Simple optimization methods can improve efficiency by selecting