Global rank:
36,251 / 155,572
Skill pts: 5

About

... more » « less

Experience

  • Supervisor Production PT Indah Kiat Pulp and Paper · Full-time Sep 2026 – Present 2 mos Serang, Serang City, Banten, Indonesia • Create monthly reports for analyzing departmental achievements, OEE (Overall Equipment Efficiency), continuous improvement, and controlling production
    • Conducting Root Cause Analysis (RCA) for production stoppages and quality issues to identify corrective and preventive actions and improve equipment and process reliability
  • Maintenance Planner PT Indahkiat Pulp and Paper · Full-time Apr 2025 – Sep 2026 1 yrs 5 mos Serang, Serang City, Banten, Indonesia • Maintain parts inventory and identify critical component needs, establish safety stock requirements in SAP to minimize downtime.
    • Carry out the process of purchasing spare parts according to requests from machine users.
    • Coordinate with all stakeholders involved in purchasing spare parts, control PR release, PO release and spare parts arrival.
    • Analyze and develop maintenance strategies with the technical team for continuous improvemen.
  • Mechanical Maintenance Utility PT Indahkiat Pulp and Paper · Full-time Sep 2024 – Mar 2025 6 mos Serang, Serang City, Banten, Indonesia • Performing overhaul on the brown cardboard machine, such as repairing bearings, belts.
    • Leaking hydraulic seals on the machine feeder, welding on the conveyor.
    • Create an inventory list of all utility pumps.
    • Create an isometric design of the pipeline to regenerate the old pipeline.
    • Determining the required quantity and type of materials based on isometrics that have been created.
    • Make a list of spare parts for utility needs such as pipe and pump materials.
  • Site Mechanical Engineer Project PT Sinbar Persada Indonesia (Wilmar Group) · Full-time Jun 2023 – Sep 2024 1 yrs 3 mos Serang, Serang City, Banten, Indonesia • Interpreting the mechanical construction design into materials selection.
    • Determining the required quantity and type of materials based on P&ID.
    • Calculating Bill of Quantity (BOQ).
    • Supervising the progress of mechanical construction, including piping & heavy equipment installation, erection, and commissioning.
    • Ensuring all mechanical equipment (actuator valve, flow meter, temperature transmitter, level transmitter) in the construction process complies with the company's standard.
    • Ensure package tests (Quality Control) run well by maintaining quality according to applicable standards. (NDT, radiografi test, pressure test, service test).
    • Coordinate with all stakeholders involved in the project.
    • Create reports to be submitted to the management team.
  • Operational Staff PT Biofarma · Contract Jun 2020 – Jun 2023 3 yrs Bandung, Bandung City, West Java, Indonesia • PIC vial washer and depyrogenization machines.
    • Perform preventive maintenance on these machines.
    • Maintain a clean work environment.
    • Work by implementing GMP (Good Manufacturing Practices).
    • Create production report documents, when production has been completed.
    • Perform repairs on vial washer and depyrogenization machine damage such as repairing the vial washer engine exhaust blower line, repairing the nozzle on the water line in the vial washer machine, repairing transmission belt on conveyor depyrogenization machine, repairing the encoder coupling on depyrogenization machines. With all repairs done.
    • Predictive maintenance on vial washer machine bearings.
    • Replacement of grease on the vial washer machine.

Education

  • Universitas Pasundan Bachelor, Mechanic Engineer, 3.47 2019 – 2022
  • UNIVERSITAS PENDIDIKAN INDONESIA Diploma, Mechanical Engineer, 3.52 2015 – 2019

Licenses & Certifications

  • Fudamental Piping and Instumentation Diagram (P&ID) Drawing Using AutoCAD Engineering Academy Oct 2026 – Present

Stats

Joined: November 8, 2026

Last seen: November 8, 2026

Languages

Indonesian Native or bilingual proficiency

English Limited working proficiency

Location

Indonesia