Experience
-
Group Leader
LLC “SMART ENGINEERING · Full-time
Jul 2023 –
Present
2 yrs 10 mos
Tyumen, Tyumen Oblast, Russia
— Resource management;
— Labor hours estimation;
— 3D modeling (Revit, Autocad Plant 3D);
— BIM management;
— Developing work process philosophies (work documentation
release);
— Implementing engineering design tools;
— Engineering networks design (heating, water, gas supply,
ventilation, air conditioning, compressed air systems);
— Designing electrical heating systems for permafrost grounds;
— Strength calculation of pipelines;
— Solving atypical pipeline and equipment heating issues.
Achievements:
1. Formed the Installation Design department (staff of 8 people);
2. Implemented BIM modeling in the organization (Revit, Autocad Plant 3D) - eliminated network collisions in projects and increased the release rate of RD by more than 40%.
3. Implemented a standard control program in the organization – improving the quality of products from 43% to 96%;
4. Developed internal philosophies for the work of the department, paperwork and interdisciplinary interactions. -
Design engineer of the 1st category
PJSC SIBUR · Full-time
Nov 2019 –
Jun 2022
2 yrs 7 mos
Tyumen, Tyumen Oblast, Russia
Responsibilities:
— Participation in collecting initial data on the design object.
— Combining technical solutions of varying complexity with related disciplines.
— Making decisions on heat and energy consumption.
— Participation in inspection and acceptance of documentation.
— Author's supervision of projects.
— Coordination of main technical solutions for complex objects (calculations, diagrams, plans, etc.).
— Thermal and aerodynamic calculation of heat engineering equipment.
— Equipment selection.
— Coordination of design documentation.
— Design of the heat and mechanical principle diagram of the boiler house.
— Technical and economic calculations of equipment.
— Design of Thermal insulation of pipelines and equipment sections.
— Design of Electric heating of pipelines and equipment sections.
Achievements:
1. Achieved a higher than expected KPI of 135%;
2. Tools have been introduced to increase the speed of manufactured project products by automating processes (processing of initial data and the release of finished BOM, BOQ are carried out in a single window mode).
3. Defects in the existing methods of calculating thermal insulation have been corrected.
4. Improvement of the thermal insulation calculation tool and electric heating systems. -
Head of the HVAC and Plumbing Group
PKTI "Promtekhproekt" · Full-time
Jan 2019 –
Nov 2019
10 mos
Tyumen, Tyumen Oblast, Russia
— Development of engineering documentation related to heating, ventilation, and air conditioning (HVAC).
— Participation in gathering initial data for design projects.
— Supervision of the detailed development of accepted technical solutions.
— Coordination of technical solutions of varying complexity with related disciplines.
— Decision making regarding heat and energy consumption.
— Preparation of explanatory notes for the "PD" stages.
— Participation in inspection and acceptance of documentation.
— Author's supervision of projects.
Approval of major technical decisions for complex projects (calculations, diagrams, plans, etc.).
— Thermal and aerodynamic calculations of thermal equipment.
— Equipment selection.
— Coordination of project documentation.
— Design of the thermal-mechanical schematic diagram of the boiler room.
— Design of the heat energy consumption metering point.
— Design of the fuel consumption metering point.
— Technical and economic calculations of equipment. -
Completion of military service by conscription
Military unit 58661-93 · Full-time
Dec 2017 –
Dec 2018
1 yrs
Tyumen, Tyumen Oblast, Russia
— Certificate of appreciation for good service.
— A letter of thanks to the mother for the service of the defender of the Fatherland. -
heating engineer
JSC Tyumen-Diesel · Full-time
Jun 2015 –
Dec 2017
2 yrs 6 mos
Tyumen, Tyumen Oblast, Russia
— Thermal and aerodynamic calculation of thermal equipment.
— Equipment selection.
— Coordination of project documentation.
— Design of the principal heat-mechanical scheme of the boiler house.
— Design of the thermal energy consumption metering point.
— Design of the fuel consumption metering point.
— Technical and economic calculations of equipment for block-modular boiler projects.
— Calculations of the heating and ventilation system.
— Design of the heating and ventilation system.
— Development of technical specifications.
— Development of operating instructions.
— Preparation of technical specifications, working with projects and conducting tenders for the execution of engineering systems for the complex.
— Working with companies providing technical maintenance services for objects.
— Participation in inspections conducted by state supervision authorities, inspections, and commissions.
— Selection of water treatment installations for boiler houses.
— Calculation of heat exchange equipment.
— Verification calculations and design of boilers up to 6 MW.
Education
- Tyumen Industrial University Master's Degree, Industrial thermal power engineering and Thermal Engineering" 2019 – 2031 (expected)
Stats
0 followers, 0 following
Joined: November 26, 2024
Last seen: November 26, 2024
Languages
Russian Full professional proficiency
English Limited working proficiency
Location
Russia