About the job
I need five short boardwalk shop drawings updated within the next 18–24 hours. They were originally drafted as level, but each boardwalk actually follows a specific slope and includes intermediate landings. I will supply the current DWG files together with the correct long-section references and any other data you may need. I have attached the current PDF files, as well as the file with the correct long sections.
Your task is to integrate the precise grades and landing details so the drawings accurately reflect onsite conditions and remain fabrication-ready. Once finished, please return the updated DWGs (layer structure preserved) along with clean PDFs for quick review.
There will also be 2 boardwalks that shouldnt need any adjustment - just updating to match the new outputs
Because of the tight turnaround, I’m looking for someone who has handled similar structural or civil detailing before—please highlight that experience in your bid. Accuracy and speed are equally critical; I’ll review and release payment as soon as the revised files match the long sections and dimension checks out.
I need five short boardwalk shop drawings updated within the next 18–24 hours. They were originally drafted as level, but each boardwalk actually follows a specific slope and includes intermediate landings. I will supply the current DWG files together with the correct long-section references and any other data you may need. I have attached the current PDF files, as well as the file with the correct long sections.
Your task is to integrate the precise grades and landing details so the drawings accurately reflect onsite conditions and remain fabrication-ready. Once finished, please return the updated DWGs (layer structure preserved) along with clean PDFs for quick review.
There will also be 2 boardwalks that shouldnt need any adjustment - just updating to match the new outputs
Because of the tight turnaround, I’m looking for someone who has handled similar structural or civil detailing before—please highlight that experience in your bid. Accuracy and speed are equally critical; I’ll review and release payment as soon as the revised files match the long sections and dimension checks out.
I need five short boardwalk shop drawings updated within the next 18–24 hours. They were originally drafted as level, but each boardwalk actually follows a specific slope and includes intermediate landings. I will supply the current DWG files together with the correct long-section references and any other data you may need. I have attached the current PDF files, as well as the file with the correc...
read more
I need five short boardwalk shop drawings updated within the next 18–24 hours. They were originally drafted as level, but each boardwalk actually follows a specific slope and includes intermediate landings. I will supply the current DWG files together with the correct long-section references and any other data you may need. I have attached the current PDF files, as well as the file with the correct long sections.
Your task is to integrate the precise grades and landing details so the drawings accurately reflect onsite conditions and remain fabrication-ready. Once finished, please return the updated DWGs (layer structure preserved) along with clean PDFs for quick review.
There will also be 2 boardwalks that shouldnt need any adjustment - just updating to match the new outputs
Because of the tight turnaround, I’m looking for someone who has handled similar structural or civil detailing before—please highlight that experience in your bid. Accuracy and speed are equally critical; I’ll review and release payment as soon as the revised files match the long sections and dimension checks out.
read less