We require a Forklift Attachment for a 2.5T Forklift to handle 150mm EPS Roof Panels onto top of 3m Buildings during construction. The attached sketches depict what we require. The Frame is to carry up to 6 of 150mm Roof Panels at a max length of 3500mm. The panels will be unloaded from the frame by 2x Workers on Access Platforms that will run alongside the Building. The Access width is 1m per side.
A Concrete Block will be used to Counterweight the panel load.
Construction types we can accept are: Fabricated Steel or Steel Stud Frame. (Bluescope Truecore)
Design is to include a FEA and Report for Certification by Local Engineer. GA and Shop Drawings. PDF and DWG files to be provided. Files must be Autocad Compatible. Drawings must be in English, all Dimmension to be Metric. Ideally the design will satisfy Australian Standards.
Attached is the EPS Roof Panel Data Sheet and Sketches of Concept.
Require design to be completed within 7 Days of Award. Job will be at a Fixed Fee.
We require a Forklift Attachment for a 2.5T Forklift to handle 150mm EPS Roof Panels onto top of 3m Buildings during construction. The attached sketches depict what we require. The Frame is to carry up to 6 of 150mm Roof Panels at a max length of 3500mm. The panels will be unloaded from the frame by 2x Workers on Access Platforms that will run alongside the Building. The Access width is 1m per side.
A Concrete Block will be used to Counterweight the panel load.
Construction types we can accept are: Fabricated Steel or Steel Stud Frame. (Bluescope Truecore)
Design is to include a FEA and Report for Certification by Local Engineer. GA and Shop Drawings. PDF and DWG files to be provided. Files must be Autocad Compatible. Drawings must be in English, all Dimmension to be Metric. Ideally the design will satisfy Australian Standards.
Attached is the EPS Roof Panel Data Sheet and Sketches of Concept.
Require design to be completed within 7 Days of Award. Job will be at a Fixed Fee.
We require a Forklift Attachment for a 2.5T Forklift to handle 150mm EPS Roof Panels onto top of 3m Buildings during construction. The attached sketches depict what we require. The Frame is to carry up to 6 of 150mm Roof Panels at a max length of 3500mm. The panels will be unloaded from the frame by 2x Workers on Access Platforms that will run alongside the Building. The Access width is 1m per sid...
read more
We require a Forklift Attachment for a 2.5T Forklift to handle 150mm EPS Roof Panels onto top of 3m Buildings during construction. The attached sketches depict what we require. The Frame is to carry up to 6 of 150mm Roof Panels at a max length of 3500mm. The panels will be unloaded from the frame by 2x Workers on Access Platforms that will run alongside the Building. The Access width is 1m per side.
A Concrete Block will be used to Counterweight the panel load.
Construction types we can accept are: Fabricated Steel or Steel Stud Frame. (Bluescope Truecore)
Design is to include a FEA and Report for Certification by Local Engineer. GA and Shop Drawings. PDF and DWG files to be provided. Files must be Autocad Compatible. Drawings must be in English, all Dimmension to be Metric. Ideally the design will satisfy Australian Standards.
Attached is the EPS Roof Panel Data Sheet and Sketches of Concept.
Require design to be completed within 7 Days of Award. Job will be at a Fixed Fee.
read less
20240928_162857.jpg
jpg
Sep 28, 2024
20240928_162902.jpg
jpg
Sep 28, 2024
20240928_162851.jpg
jpg
Sep 28, 2024
NOR0126 Tech Data Sheets - NorDeck v1.pdf
pdf
Sep 28, 2024
Things to know
Remote
Work location
Expert
Skill Level
Open budget
Fixed-rate
Part-time
Job type
Under 1-month
Job duration
Areas of expertise
Lifting Equipment Engineering
Job categories
Mechanical EngineeringStructural EngineeringFEA Finite Element Analysis
We have a Cable Truck requiring modifications. Need to turnaround a number of Modification Drawings, Shop Detail, BOM and MTOs in next 7 Days. We seek (1) Agency or Multiple...
2D to 3D ModelingDesign Engineering Services2D CAD Drafting Services