Design of Gas Stripper 5000 bbl/day

Project overview:- 1. Detailed 3D-Model by Solidworks. 2. Pressure Vessel design by PV-Elite . 3. Detailed fabrication drawings (GA, nozzle orientation, internals) by Solidworks & Autocad. 4. Prepare ITB (invitation to bid), Review all Fabrication Proposals, Prepare TBE (Technical Bid Evaluation), Fill UDR (User's Design Requirements Form). 5. Steel structural design by Staad-pro. 6. Detailed drawings for Steel structural by Solidworks. 7. Piping stress analysis by Caesar II. 8. Piping Design by AutoCad 3D-Plant. Deliverable list:- 1. GA Drawings. 2. Detailed Fabrication Drawings for (Vessel, Skid, Piping). 3. Design Reports for (Vessel, Skid, Piping Stress). 4. Data-sheet & Specifications for all internals. 5. Material take-off (MTO) for Vessels, Structural, Piping. 6. Documents Tender Package (ITB, Specifications, TBE, UDR)
3d-model piping-design steel-structural-detailing piping-shop-drawings pressure-vessel-design pressure-vessel-drawing steel-structure-shop-drawings 3d-piping