About the job
The one-time task involves integrating a heat generator into an existing roof ventilation system (RTU). Step data of the main components will be provided as a baseline. The pictures show a prototype of the RTU with a built-in (but not connected) heat generator for a trade fair.
The aim is to:
- position the heat generator optimally
- position a communication device
- taking into account
- air flow criteria
- heat spot and heat accumulation prevention
- installability and maintainability criteria
- electrical and mechanical (gas) interfaces and connections
As a result, we expect a step file of the integration, as well as data and drawings of the flow and heat prevention components that may be designed.
Support and advice will be provided.
We are a start-up company with limited budget.
We would very much welcome a cost-effective offer from a professional and reliable design engineer who, ideally, has experience with ventilation or hydrogen technology. We estimate the number of working hours to be between 30 and 50. THANKS!
The one-time task involves integrating a heat generator into an existing roof ventilation system (RTU). Step data of the main components will be provided as a baseline. The pictures show a prototype of the RTU with a built-in (but not connected) heat generator for a trade fair.
The aim is to:
- position the heat generator optimally
- position a communication device
- taking into account
- air flow criteria
- heat spot and heat accumulation prevention
- installability and maintainability criteria
- electrical and mechanical (gas) interfaces and connections
As a result, we expect a step file of the integration, as well as data and drawings of the flow and heat prevention components that may be designed.
Support and advice will be provided.
We are a start-up company with limited budget.
We would very much welcome a cost-effective offer from a professional and reliable design engineer who, ideally, has experience with ventilation or hydrogen technology. We estimate the number of working hours to be between 30 and 50. THANKS!
The one-time task involves integrating a heat generator into an existing roof ventilation system (RTU). Step data of the main components will be provided as a baseline. The pictures show a prototype of the RTU with a built-in (but not connected) heat generator for a trade fair.
The aim is to:
- position the heat generator optimally
- position a communication device
- taking into account...
read more
The one-time task involves integrating a heat generator into an existing roof ventilation system (RTU). Step data of the main components will be provided as a baseline. The pictures show a prototype of the RTU with a built-in (but not connected) heat generator for a trade fair.
The aim is to:
- position the heat generator optimally
- position a communication device
- taking into account
- air flow criteria
- heat spot and heat accumulation prevention
- installability and maintainability criteria
- electrical and mechanical (gas) interfaces and connections
As a result, we expect a step file of the integration, as well as data and drawings of the flow and heat prevention components that may be designed.
Support and advice will be provided.
We are a start-up company with limited budget.
We would very much welcome a cost-effective offer from a professional and reliable design engineer who, ideally, has experience with ventilation or hydrogen technology. We estimate the number of working hours to be between 30 and 50. THANKS!
read less