Sample take-off report: concrete and reinforcement quantities

A fictional workshop, measured the way a paid job is measured. Concrete by element, slab area and formwork, slab mesh, and reinforcement by bar size and mark. The report sets out the measurement rules and assumptions, and lists five drawing queries, each with two readings and the effect on the quantity. Every quantity was measured twice, independently, before release. Quantities only, no prices. Sample, fictional project. Not a design, not for construction.
Published
concrete quantity-takeoff rebar boq