I developed complete HVAC shop drawings, performed VRV (Variable Refrigerant Volume) system calculations, and managed MEP coordination using Autodesk Revit.
Key tasks included:
-3D modeling of ductwork and piping systems in Revit
-Layout planning for ventilation and air conditioning
-Equipment selection and load calculations for VRV systems
-Clash detection and coordination with architectural and structural models
-Preparation of final construction-ready documentation