Beam Bar Bending Schedule & Rebar Takeoff (2.2 t)
Bar bending schedule for the beams of an RC floor: 24 bar marks with diameters, numbers, cut lengths and bend dimensions, summarized by diameter (2,213 kg total), every mark cross-checked against the drawing. Excel with live formulas. Sample from my own work; project details removed.
Published